nastylive23 nastylive23
  • 25-11-2019
  • Mathematics
contestada

a chef can finish a catering job in 6 hr. his student can do the same job in 12 hr. how long will it take them to do the job if they work together?​

Relax

Respuesta :

stephanienh12342006 stephanienh12342006
  • 29-07-2021

Answer:

3 hours

Step-by-step explanation:

Answer Link

Otras preguntas

Nia guesses that there are 120 nickels in a jar, but there are actually 125. What was her percent error.
what is the value of s in the equation 4s x 4 = 64
The College Board reported the following mean scores for the three parts of the Scholastic Aptitude Test (SAT) (The World Almanac, 2009): Critical Reading 502 M
Tips and/or tricks for narrative essays?
a brief Description about the space race
Which of the following ethnic groups in the Middle East has unsuccessfully tried to gain its own, independent state or country? Arabs, Persians, Kurds, or Turks
what is the perimeter of a hexagon with an apothem of 10
there are 6 red, 4 green, and 5 yellow marbles in a jar. What is the probability of picking a green marble, then a blue marble if you do not put back the first
The probability of winning a game is 75%. How many times should you expect to win if you play 60 times?
Which of the following can you lean about a word from its eymology