mbahadurrana63
mbahadurrana63 mbahadurrana63
  • 23-12-2022
  • Mathematics
contestada

12 workers can do a piece of work in 30 days.find how many workers should be added to finish the work in 24 days.​

Relax

Respuesta :

Otras preguntas

What is the best first step in solving the equation below. 3x−5=7x+11 Question 9 options: Add 11 to both sides Divide by 7x on both sides Subtract 3x on both si
find the polar form of 1+ i / 1- i ​
An environmental scientist wanted to test if the mean concentration of carbon trioxide in blue water exceeds the safe level of 22 blops per cubic centimeter of
According to the increasing order of toughness, list the following materials. Pearlite, martensite, bainite, spheroidite.
9-c=-13 What’s the answer
What is the simplified form of (6^2+ 4) - 15?
What was the purpose of the enforcement act
Discuss the approach of high-pressure compressed gas as a method of hydrogen storage
If a solenoid has the length of 10 cm and has 2000 turns what is the electric current required to create a magnetic field inside of a solenoid of 0.4T.
Question 11 Mesa Verde is described as: O a cuesta (a ridge with a gentle slope on one side and a steep slope (scarp) on the other. a huge depression O a trench