Hector8256 Hector8256
  • 21-11-2022
  • Business
contestada

assume that painting an office building normally takes 10 days to complete and requires two workers, each earning $50/day. however, adding another worker can reduce the painting time to 8 days. what is the expedite cost per day for crashing the painting activity

Relax

Respuesta :

Otras preguntas

A circular table has a diameter of 48". The table can be enlarged by inserting two rectangular leaves, each 18" wide and 48" long. What is the area of the expa
PLEASE HELP I need to make a simple acrostic poem for the word "CHARTER" (the definition is "a document that granted the right to form a colony")
what is 310,763,136 in word form
Consider the circle of radius 5 centered at (0,0). Find an equation of the line tangent to the circle at point (3,4). The book gives me the answer: y=-3/4(x-3)
What is 212% in a decimal
What is -0.4 as a fraction or mixed number in simplest form ?
how to work out [ (6³-9)÷23] 4
How might 2,197 be written as a base number with exponent?
What are five ways to make 64?
simplify 64a^2b^3-16b^2a^3